Description
In order to continuously leverage the energy efficiency potential of HVAC systems in the operation phase, automated control is essential.
To implement automated control, accurate indoor air condition monitoring in the building is necessary as part of the control approach.
For automated control, four main control schemes with increasing complexity can be distinguished with regard to the TBS:
- V1: Constant or scheduled operation
- V2: Open or closed loop based control
- V3: Model-predictive control without optimization
- V4: Model-predictive control with optimization
To implement automated control, accurate indoor air condition monitoring in the building is necessary as part of the control approach.
For automated control, four main control schemes with increasing complexity can be distinguished with regard to the TBS:
- V1: Constant or scheduled operation
- V2: Open or closed loop based control
- V3: Model-predictive control without optimization
- V4: Model-predictive control with optimization
| Date made available | 12 Jan 2024 |
|---|---|
| Publisher | Mendeley Data |