• 795 Citations
  • 19 h-Index
1993 …2020

Research output per year

If you made any changes in Pure these will be visible here soon.

Research Output

1993

Single-machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 25 Feb 1993, Universiteit Twente: Universiteit Twente. 16 p. (LPMOR; vol. 93-4)

Research output: Book/ReportReportProfessional

Open Access
File
31 Downloads (Pure)
1994

List scheduling revisited

Schutten, J. M. J., 1 Feb 1994, Enschede: Universiteit Twente. (Working paper LPOM; no. 94-9)

Research output: Book/ReportReportProfessional

Parallel machine scheduling with relaease dates, due dates and family setup tiems

Schutten, J. M. J., 27 Jan 1994, Proceedings Eighth International Working Seminar on Production Economics. Igls/Innsbruck, Oostenrijk, p. 241-250

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Parallel machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J. & Leussink, R. A. M., 1 Feb 1994, Enschede: University of Twente. (Working paper LPOM; no. 94-8)

Research output: Book/ReportReportProfessional

Scheduling a single machine with release dates, due dates and family setup times

Schutten, J. M. J. & Zijm, W. H. M., 1994, Operations research proceedings 1993. Eds. H. Dyckhoff, U. Derigs, M. Salomon, H.C. Tijms, p. 141-141 1 p.

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

Single-machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 12 Jul 1994, Proceedings Fourth International Workshop on Project Management and Scheduling. Leuven, Belgium, p. 17-19

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Single-machines scheduling with release dates, due dates and family setup times

Schutten, J. M. J., te Velde, R. A. & Zijm, W. H. M., 6 May 1994, p. -.

Research output: Contribution to conferencePaper

1995

Assembly shop scheduling

Schutten, J. M. J., 1995, Enschede: Laboratory of Production and Operations Management, University of Twente. 14 p. (LPOM Report; vol. 95-15)

Research output: Book/ReportReportProfessional

Hybrid job shop scheduling

Schutten, J. M. J., 2 Jun 1995, Enschede: University of Twente, Faculty of Mechanical Engineering. (LPOM Report; vol. 95-09)

Research output: Book/ReportReportOther research output

Open Access
File
13 Downloads (Pure)

Practical jop shop scheduling

Schutten, J. M. J., 1995, Enschede: Laboratory of Production and Operations Management, University of Twente. 18 p. (LPOM Report; vol. 95-12)

Research output: Book/ReportReportProfessional

1996

List scheduling revisited

Schutten, J. M. J., 1996, In : Operations research letters. 18, 4, p. 167-170

Research output: Contribution to journalArticleAcademicpeer-review

File
35 Citations (Scopus)
690 Downloads (Pure)

Parallel machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J. & Leussink, R. A. M., 1996, In : International journal of production economics. 46-47, p. 119-126

Research output: Contribution to journalArticleAcademicpeer-review

File
52 Citations (Scopus)
134 Downloads (Pure)

Shop floor scheduling with setup times: Efficiency versus leadtime performance

Schutten, J. M. J., 20 Jun 1996, Enschede: Universiteit Twente. 136 p.

Research output: ThesisPhD Thesis - Research UT, graduation UT

Open Access
File
22 Downloads (Pure)

Single-machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 1996, In : Management science. 42, 8, p. 1165-1174

Research output: Contribution to journalArticleAcademicpeer-review

Open Access
File
35 Citations (Scopus)
65 Downloads (Pure)
1997

A decision support system for multi-project capacity management

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Barneveld

Research output: Other contributionOther research output

A decision support system for ship maintenance capacity planning

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Jacksonville

Research output: Other contributionOther research output

A decision support system for ship maintenance capacity planning

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Washington, USA

Research output: Other contributionOther research output

A decision support system for ship maintenance capacity planning

de Boer, R., Schutten, J. M. J. & Zijm, W. H. M., 1997, Enschede: Laboratory of Production and Operations Management, University of Twente. 6 p. (LPOM Report; vol. 97-12)

Research output: Book/ReportReportProfessional

A Decision Support System for Ship Maintenance Capacity Planning

de Boer, R., Schutten, J. M. J. & Zijm, W. H. M., 1997, In : CIRP annals : manufacturing technology. 46, 1, p. 391-396

Research output: Contribution to journalArticleAcademicpeer-review

18 Citations (Scopus)
81 Downloads (Pure)

Automatisering bij de Rijkswerf

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Enschede

Research output: Other contributionOther research output

Capaciteitsplanning bij de Rijkswerf

Schutten, J. M. J., 3 Mar 1997, Almelo

Research output: Other contributionOther research output

Capaciteitsplanning bij de Rijkswerf

Schutten, J. M. J., 3 Mar 1997, Enkhuizen

Research output: Other contributionOther research output

Capacity planning for ship maintenance

Schutten, J. M. J., 2 Mar 1997, Osnabruck, Germany

Research output: Other contributionOther research output

DSS bij de Rijkswerf

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Enschede

Research output: Other contributionOther research output

Integral Shop Floor Control

Schutten, J. M. J., 2 Mar 1997, Enschede

Research output: Other contributionOther research output

Multi-Project Rough-Cut Capacity Planning

de Boer, R. & Schutten, J. M. J., 1997, Enschede: Laboratory of Production and Operations Management, University of Twente. (LPOM Report; vol. 97-12)

Research output: Book/ReportReportProfessional

Production Planning in Automated Manufacturing

Schutten, J. M. J., 1997, In : European journal of operational research. 101, p. 226-227

Research output: Contribution to journalArticleAcademicpeer-review

Prototype DSS voor productiemanagement: release 1.0, Rijkswerf

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Den Helder

Research output: Other contributionOther research output

Re-engineering production control at a Naval Dockyard

de Waard, A. J., de Boer, R., Schutten, J. M. J. & Zijm, W. H. M., 3 Mar 1997, p. -.

Research output: Contribution to conferencePaper

Rough-Cut Capacity Planning bij de Rijkswerf

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Den Helder

Research output: Other contributionOther research output

Shop floor scheduling with set-up times

Schutten, J. M. J., 2 Mar 1997, EURO XV / INFORMS XXXIV conference. Barcelona, Spain, p. 11-12

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Shop floor scheduling with set-up times

Schutten, J. M. J., 2 Mar 1997, Barcelona, Spain

Research output: Other contributionOther research output

1998

Capacity planning at the Royal Netherlands Navy dockyard

de Boer, R. & Schutten, J. M. J., 14 Jul 1998, Dublin, Ireland

Research output: Other contributionOther research output

Capacity planning at the Royal Netherlands Navy dockyard

de Boer, R. & Schutten, J. M. J., 28 Mar 1998, Santa Fe, USA

Research output: Other contributionOther research output

Capacity planning at the Royal Netherlands Navy dockyard book

de Boer, R. & Schutten, J. M. J., 15 Feb 1998, Operations management - Future issues and compatitive responses. p. 87-92

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

3 Citations (Scopus)

Decomposition methods for complex factory scheduling problems

Schutten, J. M. J., 1998, In : European journal of operational research. 107, 1, p. 243-244

Research output: Contribution to journalArticleAcademicpeer-review

Decomposition methods for complex factory scheduling problems

Schutten, J. M. J., 1998, In : European journal of operational research. 107, p. 243-244 2 p.

Research output: Contribution to journalArticleAcademicpeer-review

Multi-project rough-cut capacity planning

de Boer, R. & Schutten, J. M. J., 28 Mar 1998, Santa Fe, USA

Research output: Other contributionOther research output

Practical job shop scheduling

Schutten, J. M. J., 1998, In : Annals of operations research. 83, p. 161-177

Research output: Contribution to journalArticleAcademicpeer-review

Practical job shop scheduling

Schutten, J. M. J., 1998, In : Annals of operations research. 83, 0, p. 161-177 17 p.

Research output: Contribution to journalArticleAcademicpeer-review

36 Citations (Scopus)

Shop floor scheduling in discrete parts manufacturing

Meester, G. J., Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 1998, Enschede: Geen opgaven. 28 p.

Research output: Book/ReportReportProfessional

1999

Multi-project rough-cut capacity planning

de Boer, R. & Schutten, J. M. J., 1999, Flexible automation and intelligent manufacturing. Begell House Inc., p. 631-644

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

Shop floor scheduling in discrete parts manufacturing

Meester, G. J., Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 1999, Modeling manufacturing systems: from aggregate planning to real-time control. Springer, p. 25-44

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

2002

Multi-project planning in shipbuilding

van Dijk, R., Gademann, N., Schutten, J. M. J. & Schouten, G., 2002, Proceedings of the 11th International Conference on Computer Applications in Shipbuilding (ICCAS 2002), 9-12 September 2002, Malmö, Sweden. Johanssen, K. (ed.). p. 429-444 16 p.

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Modeling of capacitated transportation systems for integral scheduling

Ebben, M., van der Heijden, M. C., Hurink, J. L. & Schutten, J. M. J., 2003, Enschede: University of Twente. 21 p. (Memorandum Afdeling TW; no. 1669)

Research output: Book/ReportReportProfessional

File
60 Downloads (Pure)
2004

Modeling of capacitated transportation systems for integral scheduling

Ebben, M., van der Heijden, M. C., Hurink, J. L. & Schutten, J. M. J., Mar 2004, In : OR Spectrum = OR Spektrum. 26, 2, p. 263-282 20 p.

Research output: Contribution to journalArticleAcademicpeer-review

4 Citations (Scopus)
2005

Linear-programming-based heuristics for project capacity planning

Gademann, N. & Schutten, J. M. J., 2005, In : IIE transactions. 37, 2, p. 153-165 13 p.

Research output: Contribution to journalArticleAcademicpeer-review

23 Citations (Scopus)

Modeling of capacitated transportation systems for integral scheduling

Ebben, M., van der Heijden, M. C., Hurink, J. & Schutten, M., 2005, Container Terminals and Automated Transport Systems: Logistics Control Issues and Quantitative Decision Support. Günther, H-O. & Kim, K. H. (eds.). Berlin: Springer, p. 287-306 20 p.

Research output: Chapter in Book/Report/Conference proceedingChapterAcademicpeer-review

Open Access
File
15 Downloads (Pure)