• 761 Citations
  • 18 h-Index
1993 …2019
If you made any changes in Pure these will be visible here soon.

Research Output 1993 2019

2011
90 Downloads (Pure)

Planning and control of automated material handling systems: The merge module

Haneyah, S. W. A., Hurink, J. L., Schutten, J. M. J., Zijm, W. H. M. & Schuur, P., 2011, Annual International Conference of the German Operations Research Society 2011. Hu, B., Morasch, K., Pickl, S. & Siegle, M. (eds.). Berlin: Springer, p. 281-286 6 p. (Operations Research Proceedings; vol. 2010).

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

File
18 Citations (Scopus)

Practical extensions to a minimum cost flow model for level of repair analysis

Basten, R. J. I., van der Heijden, M. C. & Schutten, J. M. J., 2011, In : European journal of operational research. 211, 2, p. 333-342

Research output: Contribution to journalArticleAcademicpeer-review

Minimum Cost Flow
Repair
Costs
Model
Life Cycle Cost
15 Citations (Scopus)

Time-constrained project scheduling with adjacent resources

Hurink, J. L., Kok, A. L., Paulus, J. J. & Schutten, J. M. J., Jan 2011, In : Computers & operations research. 38, 1, p. 310-319 10 p.

Research output: Contribution to journalArticleAcademicpeer-review

Project Scheduling
Adjacent
Scheduling
Decomposition
Resources

Vehicle routing under time-dependent travel times

Schutten, J. M. J., 26 Sep 2011, p. -.

Research output: Contribution to conferencePaper

2010
57 Citations (Scopus)

A dynamic programming heuristic for the vehicle routing problem with time windows and European Community social legislation

Kok, A. L., Meyer, C. M., Kopfer, H. & Schutten, J. M. J., 2010, In : Transportation science. 44, 4, p. 442-454

Research output: Contribution to journalArticleAcademicpeer-review

social law
Vehicle routing
Dynamic programming
European Community
heuristics
57 Downloads (Pure)

A dynamic programming heuristic for vehicle routing with time-dependent travel times and required breaks.

Kok, A. L., Hans, E. W., Schutten, J. M. J. & Zijm, W. H. M., 2010, In : Flexible services and manufacturing journal. 2010, 22, p. 83-108

Research output: Contribution to journalArticleAcademicpeer-review

File
Vehicle routing
Travel time
Dynamic programming
Traffic congestion
Truck drivers
86 Downloads (Pure)

Inventory reduction in spare part networks by selective throughput time reduction

van der Heijden, M. C., Alvarez, E. & Schutten, J. M. J., 2010, Eindhoven: BETA, 28 p. (BETA Working paper; no. 323).

Research output: Working paper

File
16 Downloads (Pure)
File
22 Citations (Scopus)

Vehicle routing with time-dependent travel times and required breaks.

Schutten, J. M. J., 7 Nov 2010, p. -.

Research output: Contribution to conferencePaper

56 Downloads (Pure)

Vehicle Routing with Traffic Congestion and Drivers' Driving and Working Rules

Kok, A. L., Hans, E. W., Schutten, J. M. J. & Zijm, W. H. M., 2010, Enschede: University of Twente, Research School for Operations Management and Logistics (BETA). 30 p. (Beta working papers; no. 305)

Research output: Book/ReportReportOther research output

File

Vehicle routing with traffic congestion and drivers driving and working rules.

Kok, A. L., Hans, E. W., Schutten, J. M. J. & Zijm, W. H. M., 2010, Eindhoven: BETA. (BETA Working paper; no. 305)

Research output: Book/ReportReportProfessional

2009
40 Downloads (Pure)

A dynamic programming heuristic for the vehicle routing problem with time windows and EC social legislation

Kok, A. L., Meyer, C. M., Kopfer, H. & Schutten, J. M. J., 2009, Enschede: University of Twente, Research School for Operations Management and Logistics (BETA). 30 p. (BETA Working Paper; no. 270)

Research output: Book/ReportReportProfessional

File
19 Downloads (Pure)

Analyzing combined vehicle routing and break scheduling from a distributed decision making perspective.

Meyer, C. M., Kok, A. L., Kopfer, H. & Schutten, J. M. J., 2009, onbekend: University of Twente, Research School for Operations Management and Logistics (BETA). 23 p. (BETA Working Paper; no. 289)

Research output: Book/ReportReportProfessional

File
31 Citations (Scopus)
61 Downloads (Pure)

An efficient model formulation for level of repair analysis

Basten, R. J. I., Schutten, J. M. J. & van der Heijden, M. C., 2009, In : Annals of operations research. 172, 1, p. 119-142

Research output: Contribution to journalArticleAcademicpeer-review

File
16 Downloads (Pure)
Open Access
File
Iterative methods
Repair
Cost reduction
Costs
Life cycle
8 Downloads (Pure)
File
Product design
Repair
Costs
27 Downloads (Pure)

Distributed Decision Making in Combined Vehicle Routing and Break Scheduling

Meyer, C. M., Kopfer, H., Kok, A. L. & Schutten, J. M. J., 2009, onbekend: Operational Methods for Production & Logistics (OMPL). 9 p. (BETA Working Papers; no. 271)

Research output: Book/ReportReportProfessional

File
77 Downloads (Pure)

Restricted dynamic programming: a flexible framework for solving realistic VRPs

Gromicho, J., van Hoorn, J. J., Kok, A. L. & Schutten, J. M. J., 2009, onbekend: Operational Methods for Production & Logistics (OMPL). 14 p. (BETA Working Papers; no. 266)

Research output: Book/ReportReportProfessional

File
140 Downloads (Pure)
File
Vehicle routing
Traffic congestion
Travel time
Costs
Industry
42 Citations (Scopus)
2008
42 Downloads (Pure)

A Minimum Cost Flow model for Level of Repair Analysis

Basten, R. J. I., Schutten, J. M. J. & van der Heijden, M. C., 2008, onbekend: Universiteit Twente, 14 p. (Beta working papers; no. 254).

Research output: Working paper

File

Designing an Agent-Based Inter-Organizational Coordination System for Planning and Control of Container Barges in the Port of Rotterdam

Douma, A. M., Moonen, H., van de Rakt, B., van Hillegersberg, J. & Schutten, J. M. J., 14 Jun 2008, Smart Business Networks, a new Business Paradigm, Sbni 2006 Discovery: The Collected Papers. Vervest, P., van Heck, E. & Preiss, K. (eds.). Rotterdam: Rotterdam School of Management, Erasmus University, p. 382-407

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

119 Downloads (Pure)
File
44 Downloads (Pure)

Optimizing departure times in vehicle routes

Kok, A. L., Hans, E. W. & Schutten, J. M. J., 1 Jan 2008, onbekend: University of Twente. 17 p. (BETA Working Papers; no. 236)

Research output: Book/ReportReportProfessional

File

Restricted dynamic programming: a flexible framework for solving realistic VRP's

Gromicho, J., van Hoorn, J. J., Kok, A. L. & Schutten, J. M. J., 2008, onbekend: Operational Methods for Production & Logistics (OMPL). (BETA Working Paper; no. 266)

Research output: Book/ReportReportProfessional

25 Citations (Scopus)
55 Downloads (Pure)

Time-constrained project scheduling

Guldemond, T. A., Hurink, J. L., Paulus, J. J. & Schutten, J. M. J., 2008, In : Journal of scheduling. 2008, 11, p. 137-148 12 p., 10.1007/s10951-008-0059-7.

Research output: Contribution to journalArticleAcademicpeer-review

File
112 Downloads (Pure)

Time-constrained project scheduling with adjacent resources

Hurink, J. L., Kok, A. L., Paulus, J. J. & Schutten, J. M. J., 2008, onbekend: Operational Methods for Production & Logistics (OMPL). 22 p. (BETA Working Papers; no. WP 261)

Research output: Book/ReportReportProfessional

File
12 Downloads (Pure)
File
2007
38 Downloads (Pure)

Barge rotation planning and quay scheduling in the port of Rotterdam

Douma, A. M., Schuur, P. & Schutten, J. M. J., 15 May 2007, Enschede: University of Twente, Research School for Operations Management and Logistics (BETA). 32 p. (Beta working papers; no. 217)

Research output: Book/ReportReportOther research output

File
2006
22 Downloads (Pure)

Designing Agent Based Inter-Organizational Systems: Business and IOS alignment in the Port of Rotterdam

Douma, A. M., Moonen, H., van Hillegersberg, J., van de Rakt, B. & Schutten, J. M. J., 2006, onbekend: University of Twente, Research School for Operations Management and Logistics (BETA). 25 p. (BETA Working Paper; no. 179)

Research output: Book/ReportReportProfessional

File

Time-Constrained Project Scheduling

Guldemond, T. A., Hurink, J. L., Paulus, J. J. & Schutten, J. M. J., 2006, Enschede: University of Twente, Research School for Operations Management and Logistics (BETA). 16 p. (BETA publicaties. Preprints; no. WP-180)

Research output: Book/ReportReportProfessional

2005
23 Citations (Scopus)

Linear-programming-based heuristics for project capacity planning

Gademann, N. & Schutten, J. M. J., 2005, In : IIE transactions. 37, 2, p. 153-165 13 p.

Research output: Contribution to journalArticleAcademicpeer-review

8 Downloads (Pure)

Modeling of capacitated transportation systems for integral scheduling

Ebben, M., van der Heijden, M. C., Hurink, J. & Schutten, M., 2005, Container Terminals and Automated Transport Systems: Logistics Control Issues and Quantitative Decision Support. Günther, H-O. & Kim, K. H. (eds.). Berlin: Springer, p. 287-306 20 p.

Research output: Chapter in Book/Report/Conference proceedingChapterAcademicpeer-review

Open Access
File
Scheduling
Docks
Parking
2004
4 Citations (Scopus)

Modeling of capacitated transportation systems for integral scheduling

Ebben, M., van der Heijden, M. C., Hurink, J. L. & Schutten, J. M. J., Mar 2004, In : OR Spectrum = OR Spektrum. 26, 2, p. 263-282 20 p.

Research output: Contribution to journalArticleAcademicpeer-review

2003
53 Downloads (Pure)

Modeling of capacitated transportation systems for integral scheduling

Ebben, M., van der Heijden, M. C., Hurink, J. L. & Schutten, J. M. J., 2003, Enschede: University of Twente. 21 p. (Memorandum Afdeling TW; no. 1669)

Research output: Book/ReportReportProfessional

File
2002

Multi-project planning in shipbuilding

van Dijk, R., Gademann, N., Schutten, J. M. J. & Schouten, G., 2002, Proceedings of the 11th International Conference on Computer Applications in Shipbuilding (ICCAS 2002), 9-12 September 2002, Malmö, Sweden. Johanssen, K. (ed.). p. 429-444 16 p.

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

1999

Multi-project rough-cut capacity planning

de Boer, R. & Schutten, J. M. J., 1999, Flexible automation and intelligent manufacturing. Begell House Inc., p. 631-644

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

Shop floor scheduling in discrete parts manufacturing

Meester, G. J., Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 1999, Modeling manufacturing systems: from aggregate planning to real-time control. Springer, p. 25-44

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

1998

Capacity planning at the Royal Netherlands Navy dockyard

de Boer, R. & Schutten, J. M. J., 14 Jul 1998, Dublin, Ireland

Research output: Other contributionOther research output

Capacity planning at the Royal Netherlands Navy dockyard

de Boer, R. & Schutten, J. M. J., 28 Mar 1998, Santa Fe, USA

Research output: Other contributionOther research output

3 Citations (Scopus)

Capacity planning at the Royal Netherlands Navy dockyard book

de Boer, R. & Schutten, J. M. J., 15 Feb 1998, Operations management - Future issues and compatitive responses. p. 87-92

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Decomposition methods for complex factory scheduling problems

Schutten, J. M. J., 1998, In : European journal of operational research. 107, p. 243-244 2 p.

Research output: Contribution to journalArticleAcademicpeer-review

Decomposition methods for complex factory scheduling problems

Schutten, J. M. J., 1998, In : European journal of operational research. 107, 1, p. 243-244

Research output: Contribution to journalArticleAcademicpeer-review

Multi-project rough-cut capacity planning

de Boer, R. & Schutten, J. M. J., 28 Mar 1998, Santa Fe, USA

Research output: Other contributionOther research output

36 Citations (Scopus)

Practical job shop scheduling

Schutten, J. M. J., 1998, In : Annals of operations research. 83, 0, p. 161-177 17 p.

Research output: Contribution to journalArticleAcademicpeer-review

Practical job shop scheduling

Schutten, J. M. J., 1998, In : Annals of operations research. 83, p. 161-177

Research output: Contribution to journalArticleAcademicpeer-review

Shop floor scheduling in discrete parts manufacturing

Meester, G. J., Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 1998, Enschede: Geen opgaven. 28 p.

Research output: Book/ReportReportProfessional

1997

A decision support system for multi-project capacity management

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Barneveld

Research output: Other contributionOther research output

A decision support system for ship maintenance capacity planning

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Washington, USA

Research output: Other contributionOther research output