• 769 Citations
  • 19 h-Index
1993 …2019
If you made any changes in Pure these will be visible here soon.

Research Output 1993 2019

Designing an Agent-Based Inter-Organizational Coordination System for Planning and Control of Container Barges in the Port of Rotterdam

Douma, A. M., Moonen, H., van de Rakt, B., van Hillegersberg, J. & Schutten, J. M. J., 14 Jun 2008, Smart Business Networks, a new Business Paradigm, Sbni 2006 Discovery: The Collected Papers. Vervest, P., van Heck, E. & Preiss, K. (eds.). Rotterdam: Rotterdam School of Management, Erasmus University, p. 382-407

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Distributed Decision Making in Combined in Combined Vehicle Routing and Break Scheduling.

Meyer, C. M., Kopfer, H., Kok, A. L. & Schutten, J. M. J., 17 Aug 2011, Dynamics in Logistics, Part 2. Kreowski, H-J., Scholz-Reiter, B. & Thoben, K-D. (eds.). Heidelberg, Dordrecht, London, New York: Springer, p. 125-133

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Vehicle routing
Decision making
Scheduling
Planning
Experiments
29 Downloads (Pure)

Distributed Decision Making in Combined Vehicle Routing and Break Scheduling

Meyer, C. M., Kopfer, H., Kok, A. L. & Schutten, J. M. J., 2009, onbekend: Operational Methods for Production & Logistics (OMPL). 9 p. (BETA Working Papers; no. 271)

Research output: Book/ReportReportProfessional

File

DSS bij de Rijkswerf

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Enschede

Research output: Other contributionOther research output

62 Downloads (Pure)

Dynamische afvalinzameling: efficiënter en slimmer

Mes, M. R. K. & Schutten, J. M. J., 2016, In : STAtOR. 17, 3, p. 18-21

Research output: Contribution to journalArticleAcademicpeer-review

Open Access
File

Evaluating urban logistics schemes using agent-based simulation

van Heeswijk, W. J. A., Mes, M., Schutten, M. & Zijm, H., Nov 2019, (Accepted/In press) In : Transportation science.

Research output: Contribution to journalArticleAcademicpeer-review

1 Citation (Scopus)
31 Downloads (Pure)

Freight consolidation in intermodal networks with reloads

van Heeswijk, W. J. A., Mes, M. R. K., Schutten, J. M. J. & Zijm, W. H. M., Sep 2018, In : Flexible services and manufacturing journal. 30, 3, p. 452-485 34 p.

Research output: Contribution to journalArticleAcademicpeer-review

Open Access
File
Consolidation
Pickups
Costs
Planning
Decision trees
137 Downloads (Pure)

Freight consolidation in networkds with transshipments

van Heeswijk, W. J. A., Mes, M. R. K., Schutten, J. M. J. & Zijm, W. H. M., 2014, Enschede: BETA. (BETA working paper; no. 462)

Research output: Book/ReportReportProfessional

File
22 Downloads (Pure)

Freight consolidation in urban networks with transshipments

van Heeswijk, W. J. A., Mes, M. R. K. & Schutten, J. M. J., 6 Jul 2015.

Research output: Contribution to conferencePaperAcademic

File
12 Citations (Scopus)

Generic planning and control of automated material handling systems : practical requirements versus existing theory

Haneyah, S. W. A., Schutten, J. M. J., Schuur, P. & Zijm, W. H. M., 28 Nov 2013, In : Computers in industry. 64, 3, p. 177-190 14 p.

Research output: Contribution to journalArticleAcademicpeer-review

Materials handling
Planning
Baggage handling
Industry
170 Downloads (Pure)

Generic Planning and Control of Automated Material Handling Systems: Practical Requirements Versus Existing Theroy.

Haneyah, S. W. A., Zijm, W. H. M., Schutten, J. M. J. & Schuur, P., 2011, The Netherlands: BETA Research School. (BETA Working papers; no. 357)

Research output: Book/ReportReportProfessional

File
Materials handling
Planning
Baggage handling
Industry
13 Downloads (Pure)

Hybrid job shop scheduling

Schutten, J. M. J., 2 Jun 1995, Enschede: University of Twente, Faculty of Mechanical Engineering. (LPOM Report; vol. 95-09)

Research output: Book/ReportReportOther research output

Open Access
File
Scheduling
Job shop scheduling
165 Downloads (Pure)

Improving the performance of sorter systems by scheduling inbound containers

Haneyah, S. W. A., Schutten, J. M. J. & Fikse, K., 2013, Eindhoven: BETA Research School for Operations Management and Logistics. 60 p. (Beta working paper; vol. 417, no. 417)

Research output: Book/ReportReportProfessional

File
Baggage handling
Containers
Scheduling
Travel time
Dynamic loads

Improving the Performance of Sorter Systems by Scheduling Inbound Containers.

Schutten, J. M. J., 14 Oct 2012, p. -.

Research output: Contribution to conferencePaper

Integral Shop Floor Control

Schutten, J. M. J., 2 Mar 1997, Enschede

Research output: Other contributionOther research output

89 Downloads (Pure)

Inventory reduction in spare part networks by selective throughput time reduction

van der Heijden, M. C., Alvarez, E. & Schutten, J. M. J., 2010, Eindhoven: BETA, 28 p. (BETA Working paper; no. 323).

Research output: Working paper

File
20 Citations (Scopus)

Inventory reduction in spare part networks by selective throughput time reduction

van der Heijden, M. C., Alvarez, E. & Schutten, J. M. J., 4 Jan 2013, In : International journal of production economics. 143, 2, p. 509-517 9 p.

Research output: Contribution to journalArticleAcademicpeer-review

Throughput
Inventory control
Cost reduction
Supply chains
Spare parts
29 Citations (Scopus)

Inventory routing for dynamic waste collection

Mes, M. R. K., Schutten, J. M. J. & Perez Rivera, A. E., 2014, In : Waste management. 34, 9, p. 1564-1576

Research output: Contribution to journalArticleAcademicpeer-review

routing
sensor
heuristics
savings
learning
142 Downloads (Pure)

Inventory routing for dynamic waste collection

Mes, M. R. K., Schutten, J. M. J. & Perez Rivera, A. E., 2013, Enschede, the Netherlands: University of Twente. (BETA working paper; vol. 431, no. 431)

Research output: Book/ReportReportProfessional

File
Containers
Sensors
Costs
Industry
Experiments
46 Citations (Scopus)

Joint optimization of level of repair analysis and spare parts stocks

Basten, R. J. I., van der Heijden, M. C. & Schutten, J. M. J., 2012, In : European journal of operational research. 222, 3, p. 474-483

Research output: Contribution to journalArticleAcademicpeer-review

Spare Parts
Repair
Optimization
Backorder
Costs
72 Downloads (Pure)
File
Repair
Costs
Cost reduction
Logistics
Availability
119 Downloads (Pure)
File
23 Citations (Scopus)

Linear-programming-based heuristics for project capacity planning

Gademann, N. & Schutten, J. M. J., 2005, In : IIE transactions. 37, 2, p. 153-165 13 p.

Research output: Contribution to journalArticleAcademicpeer-review

33 Citations (Scopus)
554 Downloads (Pure)

List scheduling revisited

Schutten, J. M. J., 1996, In : Operations research letters. 18, 4, p. 167-170

Research output: Contribution to journalArticleAcademicpeer-review

File

List scheduling revisited

Schutten, J. M. J., 1 Feb 1994, Enschede: Universiteit Twente. (Working paper LPOM; no. 94-9)

Research output: Book/ReportReportProfessional

4 Citations (Scopus)

Modeling of capacitated transportation systems for integral scheduling

Ebben, M., van der Heijden, M. C., Hurink, J. L. & Schutten, J. M. J., Mar 2004, In : OR Spectrum = OR Spektrum. 26, 2, p. 263-282 20 p.

Research output: Contribution to journalArticleAcademicpeer-review

55 Downloads (Pure)

Modeling of capacitated transportation systems for integral scheduling

Ebben, M., van der Heijden, M. C., Hurink, J. L. & Schutten, J. M. J., 2003, Enschede: University of Twente. 21 p. (Memorandum Afdeling TW; no. 1669)

Research output: Book/ReportReportProfessional

File
10 Downloads (Pure)

Modeling of capacitated transportation systems for integral scheduling

Ebben, M., van der Heijden, M. C., Hurink, J. & Schutten, M., 2005, Container Terminals and Automated Transport Systems: Logistics Control Issues and Quantitative Decision Support. Günther, H-O. & Kim, K. H. (eds.). Berlin: Springer, p. 287-306 20 p.

Research output: Chapter in Book/Report/Conference proceedingChapterAcademicpeer-review

Open Access
File
Scheduling
Docks
Parking
5 Citations (Scopus)
73 Downloads (Pure)

Multi-hop driver-parcel matching problem with time windows

Chen, W., Mes, M. & Schutten, M., Sep 2018, In : Flexible services and manufacturing journal. 30, 3, p. 517-553 37 p.

Research output: Contribution to journalArticleAcademicpeer-review

Open Access
File
Freight transportation
Inductive logic programming (ILP)
Economics
Air pollution
Computational complexity
163 Downloads (Pure)

Multi-hop driver-parcel matching problem with time windows

Chen, W., Mes, M. R. K. & Schutten, J. M. J., 2016, Enschede, the Netherlands: University of Twente, Research School for Operations Management and Logistics (BETA). (BETA working paper; vol. 507, no. 507)

Research output: Book/ReportReportProfessional

File

Multi-project planning in shipbuilding

van Dijk, R., Gademann, N., Schutten, J. M. J. & Schouten, G., 2002, Proceedings of the 11th International Conference on Computer Applications in Shipbuilding (ICCAS 2002), 9-12 September 2002, Malmö, Sweden. Johanssen, K. (ed.). p. 429-444 16 p.

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Multi-project rough-cut capacity planning

de Boer, R. & Schutten, J. M. J., 1999, Flexible automation and intelligent manufacturing. Begell House Inc., p. 631-644

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

Multi-project rough-cut capacity planning

de Boer, R. & Schutten, J. M. J., 28 Mar 1998, Santa Fe, USA

Research output: Other contributionOther research output

Multi-Project Rough-Cut Capacity Planning

de Boer, R. & Schutten, J. M. J., 1997, Enschede: Laboratory of Production and Operations Management, University of Twente. (LPOM Report; vol. 97-12)

Research output: Book/ReportReportProfessional

46 Downloads (Pure)

Optimizing departure times in vehicle routes

Kok, A. L., Hans, E. W. & Schutten, J. M. J., 1 Jan 2008, onbekend: University of Twente. 17 p. (BETA Working Papers; no. 236)

Research output: Book/ReportReportProfessional

File
32 Citations (Scopus)
101 Downloads (Pure)

Optimizing Departure Times in Vehicle Routes

Kok, A. L., Hans, E. W. & Schutten, J. M. J., 2011, In : European journal of operational research. 2011, 201, p. 579-587 9 p.

Research output: Contribution to journalArticleAcademicpeer-review

File
Vehicle routing
Vehicle Routing Problem with Time Windows
Traffic Congestion
Traffic congestion
Truck drivers

Parallel machine scheduling with relaease dates, due dates and family setup tiems

Schutten, J. M. J., 27 Jan 1994, Proceedings Eighth International Working Seminar on Production Economics. Igls/Innsbruck, Oostenrijk, p. 241-250

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Parallel machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J. & Leussink, R. A. M., 1 Feb 1994, Enschede: University of Twente. (Working paper LPOM; no. 94-8)

Research output: Book/ReportReportProfessional

52 Citations (Scopus)
99 Downloads (Pure)

Parallel machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J. & Leussink, R. A. M., 1996, In : International journal of production economics. 46-47, p. 119-126

Research output: Contribution to journalArticleAcademicpeer-review

File
98 Downloads (Pure)

Planning and control of automated material handling systems: The merge module

Haneyah, S. W. A., Hurink, J. L., Schutten, J. M. J., Zijm, W. H. M. & Schuur, P., 2011, Annual International Conference of the German Operations Research Society 2011. Hu, B., Morasch, K., Pickl, S. & Siegle, M. (eds.). Berlin: Springer, p. 281-286 6 p. (Operations Research Proceedings; vol. 2010).

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

File
18 Citations (Scopus)

Practical extensions to a minimum cost flow model for level of repair analysis

Basten, R. J. I., van der Heijden, M. C. & Schutten, J. M. J., 2011, In : European journal of operational research. 211, 2, p. 333-342

Research output: Contribution to journalArticleAcademicpeer-review

Minimum Cost Flow
Repair
Costs
Model
Life Cycle Cost
19 Downloads (Pure)
File

Practical job shop scheduling

Schutten, J. M. J., 1998, In : Annals of operations research. 83, p. 161-177

Research output: Contribution to journalArticleAcademicpeer-review

36 Citations (Scopus)

Practical job shop scheduling

Schutten, J. M. J., 1998, In : Annals of operations research. 83, 0, p. 161-177 17 p.

Research output: Contribution to journalArticleAcademicpeer-review

Practical jop shop scheduling

Schutten, J. M. J., 1995, Enschede: Laboratory of Production and Operations Management, University of Twente. 18 p. (LPOM Report; vol. 95-12)

Research output: Book/ReportReportProfessional

Production Planning in Automated Manufacturing

Schutten, J. M. J., 1997, In : European journal of operational research. 101, p. 226-227

Research output: Contribution to journalArticleAcademicpeer-review

Prototype DSS voor productiemanagement: release 1.0, Rijkswerf

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Den Helder

Research output: Other contributionOther research output

Re-engineering production control at a Naval Dockyard

de Waard, A. J., de Boer, R., Schutten, J. M. J. & Zijm, W. H. M., 3 Mar 1997, p. -.

Research output: Contribution to conferencePaper

79 Downloads (Pure)

Restricted dynamic programming: a flexible framework for solving realistic VRPs

Gromicho, J., van Hoorn, J. J., Kok, A. L. & Schutten, J. M. J., 2009, onbekend: Operational Methods for Production & Logistics (OMPL). 14 p. (BETA Working Papers; no. 266)

Research output: Book/ReportReportProfessional

File