• 769 Citations
  • 19 h-Index
1993 …2019
If you made any changes in Pure these will be visible here soon.

Research Output 1993 2019

77 Downloads (Pure)

Restricted dynamic programming: a flexible framework for solving realistic VRPs

Gromicho, J., van Hoorn, J. J., Kok, A. L. & Schutten, J. M. J., 2009, onbekend: Operational Methods for Production & Logistics (OMPL). 14 p. (BETA Working Papers; no. 266)

Research output: Book/ReportReportProfessional

File
32 Citations (Scopus)

Restricted dynamic programming: A flexible framework for solving realistic VRP's.

Gromicho, J., van Hoorn, J. J., Kok, A. L. & Schutten, J. M. J., 2012, In : Computers & operations research. 39, 5, p. 902-909 14 p.

Research output: Contribution to journalArticleAcademicpeer-review

Vehicle routing
Vehicle Routing Problem
Dynamic programming
Dynamic Programming
Heuristics

Rough-Cut Capacity Planning bij de Rijkswerf

de Boer, R. & Schutten, J. M. J., 3 Mar 1997, Den Helder

Research output: Other contributionOther research output

Scheduling a single machine with release dates, due dates and family setup times

Schutten, J. M. J. & Zijm, W. H. M., 1994, Operations research proceedings 1993. Eds. H. Dyckhoff, U. Derigs, M. Salomon, H.C. Tijms, p. 141-141 1 p.

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

46 Downloads (Pure)

Self-rostering applied to case studies - An ILP method to construct a feasible schedule

Uijland, S., van der Veen, E., Hurink, J. L. & Schutten, J. M. J., Aug 2012, Proceedings of the 9th International Conference on the Practice and Theory of Automated Timetabling (PATAT 2012). Kjenstad, D., Riise, A., Nordlander, T. E., McCollum, B. & Burke, E. (eds.). Oslo, Norway: SINTEF, p. 384-387 4 p.

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

File

Shop floor scheduling in discrete parts manufacturing

Meester, G. J., Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 1999, Modeling manufacturing systems: from aggregate planning to real-time control. Springer, p. 25-44

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

Shop floor scheduling in discrete parts manufacturing

Meester, G. J., Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 1998, Enschede: Geen opgaven. 28 p.

Research output: Book/ReportReportProfessional

22 Downloads (Pure)

Shop floor scheduling with setup times: Efficiency versus leadtime performance

Schutten, J. M. J., 20 Jun 1996, Enschede: Universiteit Twente. 136 p.

Research output: ThesisPhD Thesis - Research UT, graduation UT

Open Access
File

Shop floor scheduling with set-up times

Schutten, J. M. J., 2 Mar 1997, Barcelona, Spain

Research output: Other contributionOther research output

Shop floor scheduling with set-up times

Schutten, J. M. J., 2 Mar 1997, EURO XV / INFORMS XXXIV conference. Barcelona, Spain, p. 11-12

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Single-machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 12 Jul 1994, Proceedings Fourth International Workshop on Project Management and Scheduling. Leuven, Belgium, p. 17-19

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

25 Downloads (Pure)

Single-machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 25 Feb 1993, Universiteit Twente: Universiteit Twente. 16 p. (LPMOR; vol. 93-4)

Research output: Book/ReportReportProfessional

Open Access
File
35 Citations (Scopus)
57 Downloads (Pure)

Single-machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 1996, In : Management science. 42, 8, p. 1165-1174

Research output: Contribution to journalArticleAcademicpeer-review

Open Access
File
Setup times
Single machine scheduling
Release dates
Due dates
Optimal solution

Single-machines scheduling with release dates, due dates and family setup times

Schutten, J. M. J., te Velde, R. A. & Zijm, W. H. M., 6 May 1994, p. -.

Research output: Contribution to conferencePaper

7 Citations (Scopus)
1 Downloads (Pure)

The delivery dispatching problem with time windows for urban consolidation centers

van Heeswijk, W. J. A., Mes, M. R. K. & Schutten, J. M. J., 1 Jan 2019, In : Transportation science. 53, 1, p. 203-221 19 p.

Research output: Contribution to journalArticleAcademicpeer-review

Dynamic programming
Consolidation
consolidation
programming
cost minimizing
196 Downloads (Pure)
File
Dynamic programming
Consolidation
Costs
Experiments
Sampling

Throughput maximization of parcel sorter systems by scheduling inbound containers

Haneyah, S. W. A., Schutten, J. M. J. & Fikse, K., 4 Sep 2013, Efficiency and Innovation in Logistics: Proceedings of the International Logistics Science Conference (ILSC) 2013. Clausen, U., ten Hompel, M. & Meier, J. F. (eds.). Berlin, Germany: Springer, p. 147-159 (Lecture notes in logistics).

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademic

Containers
Scheduling
Throughput
Travel time
Dynamic loads
25 Citations (Scopus)
58 Downloads (Pure)

Time-constrained project scheduling

Guldemond, T. A., Hurink, J. L., Paulus, J. J. & Schutten, J. M. J., 2008, In : Journal of scheduling. 2008, 11, p. 137-148 12 p., 10.1007/s10951-008-0059-7.

Research output: Contribution to journalArticleAcademicpeer-review

File

Time-Constrained Project Scheduling

Guldemond, T. A., Hurink, J. L., Paulus, J. J. & Schutten, J. M. J., 2006, Enschede: University of Twente, Research School for Operations Management and Logistics (BETA). 16 p. (BETA publicaties. Preprints; no. WP-180)

Research output: Book/ReportReportProfessional

15 Citations (Scopus)

Time-constrained project scheduling with adjacent resources

Hurink, J. L., Kok, A. L., Paulus, J. J. & Schutten, J. M. J., Jan 2011, In : Computers & operations research. 38, 1, p. 310-319 10 p.

Research output: Contribution to journalArticleAcademicpeer-review

Project Scheduling
Adjacent
Scheduling
Decomposition
Resources
116 Downloads (Pure)

Time-constrained project scheduling with adjacent resources

Hurink, J. L., Kok, A. L., Paulus, J. J. & Schutten, J. M. J., 2008, onbekend: Operational Methods for Production & Logistics (OMPL). 22 p. (BETA Working Papers; no. WP 261)

Research output: Book/ReportReportProfessional

File
1 Downloads (Pure)

Transportation Management

van Heeswijk, W., Mes, M. & Schutten, M., 2019, Operations, Logistics and Supply Chain Management. Zijm, H., Klumpp, M., Regattieri, A. & Heragu, S. (eds.). Springer, p. 469-491 (Lecture notes in logistics).

Research output: Chapter in Book/Report/Conference proceedingChapterAcademicpeer-review

Intermodal transportation
Logistics
Internet
12 Downloads (Pure)
File

Vehicle routing under time-dependent travel times

Schutten, J. M. J., 26 Sep 2011, p. -.

Research output: Contribution to conferencePaper

147 Downloads (Pure)
File
Vehicle routing
Traffic congestion
Travel time
Costs
Industry
91 Citations (Scopus)

Vehicle routing under time-dependent travel times: The impact of congestion avoidance

Kok, A. L., Hans, E. W. & Schutten, J. M. J., 2012, In : Computers & operations research. 39, 5, p. 910-918

Research output: Contribution to journalArticleAcademicpeer-review

Vehicle Routing
Vehicle routing
Traffic Congestion
Traffic congestion
Travel Time
207 Downloads (Pure)

Vehicle routing with restricted loading capacities.

Gromicho, J., van Hoorn, J. J., Kok, A. L. & Schutten, J. M. J., 2012, BETA. (BETA working papers; no. 396)

Research output: Book/ReportReportProfessional

Open Access
File
22 Citations (Scopus)

Vehicle routing with time-dependent travel times and required breaks.

Schutten, J. M. J., 7 Nov 2010, p. -.

Research output: Contribution to conferencePaperAcademic

57 Downloads (Pure)

Vehicle Routing with Traffic Congestion and Drivers' Driving and Working Rules

Kok, A. L., Hans, E. W., Schutten, J. M. J. & Zijm, W. H. M., 2010, Enschede: University of Twente, Research School for Operations Management and Logistics (BETA). 30 p. (Beta working papers; no. 305)

Research output: Book/ReportReportOther research output

File

Vehicle routing with traffic congestion and drivers driving and working rules.

Kok, A. L., Hans, E. W., Schutten, J. M. J. & Zijm, W. H. M., 2010, Eindhoven: BETA. (BETA Working paper; no. 305)

Research output: Book/ReportReportProfessional

42 Citations (Scopus)