• 769 Citations
  • 19 h-Index
1993 …2019
If you made any changes in Pure these will be visible here soon.

Research Output 1993 2019

Report
13 Downloads (Pure)

Hybrid job shop scheduling

Schutten, J. M. J., 2 Jun 1995, Enschede: University of Twente, Faculty of Mechanical Engineering. (LPOM Report; vol. 95-09)

Research output: Book/ReportReportOther research output

Open Access
File
Scheduling
Job shop scheduling
165 Downloads (Pure)

Improving the performance of sorter systems by scheduling inbound containers

Haneyah, S. W. A., Schutten, J. M. J. & Fikse, K., 2013, Eindhoven: BETA Research School for Operations Management and Logistics. 60 p. (Beta working paper; vol. 417, no. 417)

Research output: Book/ReportReportProfessional

File
Baggage handling
Containers
Scheduling
Travel time
Dynamic loads
142 Downloads (Pure)

Inventory routing for dynamic waste collection

Mes, M. R. K., Schutten, J. M. J. & Perez Rivera, A. E., 2013, Enschede, the Netherlands: University of Twente. (BETA working paper; vol. 431, no. 431)

Research output: Book/ReportReportProfessional

File
Containers
Sensors
Costs
Industry
Experiments

List scheduling revisited

Schutten, J. M. J., 1 Feb 1994, Enschede: Universiteit Twente. (Working paper LPOM; no. 94-9)

Research output: Book/ReportReportProfessional

55 Downloads (Pure)

Modeling of capacitated transportation systems for integral scheduling

Ebben, M., van der Heijden, M. C., Hurink, J. L. & Schutten, J. M. J., 2003, Enschede: University of Twente. 21 p. (Memorandum Afdeling TW; no. 1669)

Research output: Book/ReportReportProfessional

File
163 Downloads (Pure)

Multi-hop driver-parcel matching problem with time windows

Chen, W., Mes, M. R. K. & Schutten, J. M. J., 2016, Enschede, the Netherlands: University of Twente, Research School for Operations Management and Logistics (BETA). (BETA working paper; vol. 507, no. 507)

Research output: Book/ReportReportProfessional

File

Multi-Project Rough-Cut Capacity Planning

de Boer, R. & Schutten, J. M. J., 1997, Enschede: Laboratory of Production and Operations Management, University of Twente. (LPOM Report; vol. 97-12)

Research output: Book/ReportReportProfessional

46 Downloads (Pure)

Optimizing departure times in vehicle routes

Kok, A. L., Hans, E. W. & Schutten, J. M. J., 1 Jan 2008, onbekend: University of Twente. 17 p. (BETA Working Papers; no. 236)

Research output: Book/ReportReportProfessional

File

Parallel machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J. & Leussink, R. A. M., 1 Feb 1994, Enschede: University of Twente. (Working paper LPOM; no. 94-8)

Research output: Book/ReportReportProfessional

19 Downloads (Pure)
File

Practical jop shop scheduling

Schutten, J. M. J., 1995, Enschede: Laboratory of Production and Operations Management, University of Twente. 18 p. (LPOM Report; vol. 95-12)

Research output: Book/ReportReportProfessional

Restricted dynamic programming: a flexible framework for solving realistic VRP's

Gromicho, J., van Hoorn, J. J., Kok, A. L. & Schutten, J. M. J., 2008, onbekend: Operational Methods for Production & Logistics (OMPL). (BETA Working Paper; no. 266)

Research output: Book/ReportReportProfessional

79 Downloads (Pure)

Restricted dynamic programming: a flexible framework for solving realistic VRPs

Gromicho, J., van Hoorn, J. J., Kok, A. L. & Schutten, J. M. J., 2009, onbekend: Operational Methods for Production & Logistics (OMPL). 14 p. (BETA Working Papers; no. 266)

Research output: Book/ReportReportProfessional

File

Shop floor scheduling in discrete parts manufacturing

Meester, G. J., Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 1998, Enschede: Geen opgaven. 28 p.

Research output: Book/ReportReportProfessional

26 Downloads (Pure)

Single-machine scheduling with release dates, due dates and family setup times

Schutten, J. M. J., van de Velde, S. L. & Zijm, W. H. M., 25 Feb 1993, Universiteit Twente: Universiteit Twente. 16 p. (LPMOR; vol. 93-4)

Research output: Book/ReportReportProfessional

Open Access
File
202 Downloads (Pure)
File
Dynamic programming
Consolidation
Costs
Experiments
Sampling

Time-Constrained Project Scheduling

Guldemond, T. A., Hurink, J. L., Paulus, J. J. & Schutten, J. M. J., 2006, Enschede: University of Twente, Research School for Operations Management and Logistics (BETA). 16 p. (BETA publicaties. Preprints; no. WP-180)

Research output: Book/ReportReportProfessional

118 Downloads (Pure)

Time-constrained project scheduling with adjacent resources

Hurink, J. L., Kok, A. L., Paulus, J. J. & Schutten, J. M. J., 2008, onbekend: Operational Methods for Production & Logistics (OMPL). 22 p. (BETA Working Papers; no. WP 261)

Research output: Book/ReportReportProfessional

File
13 Downloads (Pure)
File
153 Downloads (Pure)
File
Vehicle routing
Traffic congestion
Travel time
Costs
Industry
208 Downloads (Pure)

Vehicle routing with restricted loading capacities.

Gromicho, J., van Hoorn, J. J., Kok, A. L. & Schutten, J. M. J., 2012, BETA. (BETA working papers; no. 396)

Research output: Book/ReportReportProfessional

Open Access
File
58 Downloads (Pure)

Vehicle Routing with Traffic Congestion and Drivers' Driving and Working Rules

Kok, A. L., Hans, E. W., Schutten, J. M. J. & Zijm, W. H. M., 2010, Enschede: University of Twente, Research School for Operations Management and Logistics (BETA). 30 p. (Beta working papers; no. 305)

Research output: Book/ReportReportOther research output

File

Vehicle routing with traffic congestion and drivers driving and working rules.

Kok, A. L., Hans, E. W., Schutten, J. M. J. & Zijm, W. H. M., 2010, Eindhoven: BETA. (BETA Working paper; no. 305)

Research output: Book/ReportReportProfessional

Working paper
44 Downloads (Pure)

A Minimum Cost Flow model for Level of Repair Analysis

Basten, R. J. I., Schutten, J. M. J. & van der Heijden, M. C., 2008, onbekend: Universiteit Twente, 14 p. (Beta working papers; no. 254).

Research output: Working paper

File
29 Downloads (Pure)
File
Repair
Cost reduction
Availability
Experiments
16 Downloads (Pure)
Open Access
File
Iterative methods
Repair
Cost reduction
Costs
Life cycle
8 Downloads (Pure)
File
Product design
Repair
Costs
89 Downloads (Pure)

Inventory reduction in spare part networks by selective throughput time reduction

van der Heijden, M. C., Alvarez, E. & Schutten, J. M. J., 2010, Eindhoven: BETA, 28 p. (BETA Working paper; no. 323).

Research output: Working paper

File
72 Downloads (Pure)
File
Repair
Costs
Cost reduction
Logistics
Availability
119 Downloads (Pure)
File