A solution system for maximizing time-constrained throughput in discrete batch production

P.J. Weeda

    Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

    Original languageUndefined
    Title of host publicationProceedings of the 12th International conference on Production Research
    Place of PublicationEds. V. Orpanu and A. Lukka
    PublisherV. Orpanu and A. Lukka (eds.)
    Pages431-432
    Publication statusPublished - 22 Feb 1993

    Keywords

    • METIS-145423

    Cite this

    Weeda, P. J. (1993). A solution system for maximizing time-constrained throughput in discrete batch production. In Proceedings of the 12th International conference on Production Research (pp. 431-432). Eds. V. Orpanu and A. Lukka: V. Orpanu and A. Lukka (eds.).
    Weeda, P.J. / A solution system for maximizing time-constrained throughput in discrete batch production. Proceedings of the 12th International conference on Production Research. Eds. V. Orpanu and A. Lukka : V. Orpanu and A. Lukka (eds.), 1993. pp. 431-432
    @inproceedings{4a6c5a511b0d45b7ad4919d186f6ca9d,
    title = "A solution system for maximizing time-constrained throughput in discrete batch production",
    keywords = "METIS-145423",
    author = "P.J. Weeda",
    year = "1993",
    month = "2",
    day = "22",
    language = "Undefined",
    pages = "431--432",
    booktitle = "Proceedings of the 12th International conference on Production Research",
    publisher = "V. Orpanu and A. Lukka (eds.)",

    }

    Weeda, PJ 1993, A solution system for maximizing time-constrained throughput in discrete batch production. in Proceedings of the 12th International conference on Production Research. V. Orpanu and A. Lukka (eds.), Eds. V. Orpanu and A. Lukka, pp. 431-432.

    A solution system for maximizing time-constrained throughput in discrete batch production. / Weeda, P.J.

    Proceedings of the 12th International conference on Production Research. Eds. V. Orpanu and A. Lukka : V. Orpanu and A. Lukka (eds.), 1993. p. 431-432.

    Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

    TY - GEN

    T1 - A solution system for maximizing time-constrained throughput in discrete batch production

    AU - Weeda, P.J.

    PY - 1993/2/22

    Y1 - 1993/2/22

    KW - METIS-145423

    M3 - Conference contribution

    SP - 431

    EP - 432

    BT - Proceedings of the 12th International conference on Production Research

    PB - V. Orpanu and A. Lukka (eds.)

    CY - Eds. V. Orpanu and A. Lukka

    ER -

    Weeda PJ. A solution system for maximizing time-constrained throughput in discrete batch production. In Proceedings of the 12th International conference on Production Research. Eds. V. Orpanu and A. Lukka: V. Orpanu and A. Lukka (eds.). 1993. p. 431-432