Abstract
In this paper, we report preliminary ideas from our project called “Time Performance Improvement With Parallel Processing Systems‿ (TIPS). In the TIPS project, we plan to take advantage of multi-core platforms for performance improvement by parallelizing a complex soft real-time application. In order to increase the timing performance, one needs to adapt the optimizations on the critical execution paths of an application which are both significantly time consuming and important from user requirements' perspective. In this work, we present an approach how to detect critical paths in a target application.
Original language | Undefined |
---|---|
Title of host publication | Proceedings of the 22nd Euromicro International Conference on Parallel, Distributed and network-based Processing, PDP 2014, Work In Progress Session |
Place of Publication | Italy |
Publisher | SEA-Johannes Kepler University Linz |
Pages | - |
Number of pages | 2 |
ISBN (Print) | 978-3-902457-39-4 |
Publication status | Published - Feb 2014 |
Event | 22nd Euromicro International Conference on Parallel, Distributed, and Network-Based Processing, PDP 2014 - Turin, Italy Duration: 12 Feb 2014 → 14 Feb 2014 Conference number: 22 |
Publication series
Name | |
---|---|
Publisher | SEA-Johannes Kepler University Linz |
Conference
Conference | 22nd Euromicro International Conference on Parallel, Distributed, and Network-Based Processing, PDP 2014 |
---|---|
Abbreviated title | PDP |
Country | Italy |
City | Turin |
Period | 12/02/14 → 14/02/14 |
Keywords
- CR-D.2
- METIS-309553
- IR-93191
- EWI-24565