Any objections after all? Decision making on the siting of a domestic waste incinerator in Wijster, the Netherlands

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

Abstract

The initiative to realise a waste incinerator facility was taken in 1986 by the waste treatment company ‘Vuilafvoer Maatschappij NV’ (VAM) in the village of Wijster. This village is incorporated in the municipality of Beilen, which is located in the province of Drenthe. The VAM company has a long tradition of composting the Dutch biodegradable waste fraction. The compostable fraction is taken there by train from all over the country. As a result of terminating the traditional process, the waste fraction that had to be deposited (at the same location) increased tremendously, which resulted in an increase in the deposited volume of 6 million cubic meters in about 7 years. At that time the existing landfill had nearly reached its maximum capacity. In order to reduce the fraction of the processed waste that had to be dumped, the VAM company proposed to build a waste incineration facility. The incinerator was planned to reach a maximum capacity of 350,000 tons/year of domestic waste. In order to build this incinerator several phases had to be passed: the environmental impact assessment, the provincial waste plan, the region plan, and changing the local land use plans. These procedures developed partly in parallel in a coordinated way.
Original languageEnglish
Title of host publicationThe waste and the backyard : the creation of waste facilities: success stories in six European countries
EditorsBruno Dente, Paolo Fareri, J.J. Ligteringen
Place of PublicationDordrecht/Boston/London
PublisherKluwer Academic Publishers
Pages175-195
Number of pages22
ISBN (Print)978-90-481-5021-2
DOIs
Publication statusPublished - 1998

Publication series

NameEnvironment & management
PublisherKluwer Academic Publishers
Number8
Volume8
ISSN (Print)0926-9711

Fingerprint

domestic waste
decision making
village
waste treatment
environmental impact assessment
incineration
composting
train
landfill
waste incinerator
objection

Keywords

  • IR-4888
  • METIS-101822

Cite this

Bressers, J. T. A. (1998). Any objections after all? Decision making on the siting of a domestic waste incinerator in Wijster, the Netherlands. In B. Dente, P. Fareri, & J. J. Ligteringen (Eds.), The waste and the backyard : the creation of waste facilities: success stories in six European countries (pp. 175-195). (Environment & management; Vol. 8, No. 8). Dordrecht/Boston/London: Kluwer Academic Publishers. https://doi.org/10.1007/978-94-015-9107-2_7
Bressers, Johannes T.A. / Any objections after all? Decision making on the siting of a domestic waste incinerator in Wijster, the Netherlands. The waste and the backyard : the creation of waste facilities: success stories in six European countries. editor / Bruno Dente ; Paolo Fareri ; J.J. Ligteringen. Dordrecht/Boston/London : Kluwer Academic Publishers, 1998. pp. 175-195 (Environment & management; 8).
@inbook{5ff2792f0027451e9af8a15db0266e9a,
title = "Any objections after all? Decision making on the siting of a domestic waste incinerator in Wijster, the Netherlands",
abstract = "The initiative to realise a waste incinerator facility was taken in 1986 by the waste treatment company ‘Vuilafvoer Maatschappij NV’ (VAM) in the village of Wijster. This village is incorporated in the municipality of Beilen, which is located in the province of Drenthe. The VAM company has a long tradition of composting the Dutch biodegradable waste fraction. The compostable fraction is taken there by train from all over the country. As a result of terminating the traditional process, the waste fraction that had to be deposited (at the same location) increased tremendously, which resulted in an increase in the deposited volume of 6 million cubic meters in about 7 years. At that time the existing landfill had nearly reached its maximum capacity. In order to reduce the fraction of the processed waste that had to be dumped, the VAM company proposed to build a waste incineration facility. The incinerator was planned to reach a maximum capacity of 350,000 tons/year of domestic waste. In order to build this incinerator several phases had to be passed: the environmental impact assessment, the provincial waste plan, the region plan, and changing the local land use plans. These procedures developed partly in parallel in a coordinated way.",
keywords = "IR-4888, METIS-101822",
author = "Bressers, {Johannes T.A.}",
year = "1998",
doi = "10.1007/978-94-015-9107-2_7",
language = "English",
isbn = "978-90-481-5021-2",
series = "Environment & management",
publisher = "Kluwer Academic Publishers",
number = "8",
pages = "175--195",
editor = "Bruno Dente and Paolo Fareri and J.J. Ligteringen",
booktitle = "The waste and the backyard : the creation of waste facilities: success stories in six European countries",
address = "Netherlands",

}

Bressers, JTA 1998, Any objections after all? Decision making on the siting of a domestic waste incinerator in Wijster, the Netherlands. in B Dente, P Fareri & JJ Ligteringen (eds), The waste and the backyard : the creation of waste facilities: success stories in six European countries. Environment & management, no. 8, vol. 8, Kluwer Academic Publishers, Dordrecht/Boston/London, pp. 175-195. https://doi.org/10.1007/978-94-015-9107-2_7

Any objections after all? Decision making on the siting of a domestic waste incinerator in Wijster, the Netherlands. / Bressers, Johannes T.A.

The waste and the backyard : the creation of waste facilities: success stories in six European countries. ed. / Bruno Dente; Paolo Fareri; J.J. Ligteringen. Dordrecht/Boston/London : Kluwer Academic Publishers, 1998. p. 175-195 (Environment & management; Vol. 8, No. 8).

Research output: Chapter in Book/Report/Conference proceedingChapterAcademic

TY - CHAP

T1 - Any objections after all? Decision making on the siting of a domestic waste incinerator in Wijster, the Netherlands

AU - Bressers, Johannes T.A.

PY - 1998

Y1 - 1998

N2 - The initiative to realise a waste incinerator facility was taken in 1986 by the waste treatment company ‘Vuilafvoer Maatschappij NV’ (VAM) in the village of Wijster. This village is incorporated in the municipality of Beilen, which is located in the province of Drenthe. The VAM company has a long tradition of composting the Dutch biodegradable waste fraction. The compostable fraction is taken there by train from all over the country. As a result of terminating the traditional process, the waste fraction that had to be deposited (at the same location) increased tremendously, which resulted in an increase in the deposited volume of 6 million cubic meters in about 7 years. At that time the existing landfill had nearly reached its maximum capacity. In order to reduce the fraction of the processed waste that had to be dumped, the VAM company proposed to build a waste incineration facility. The incinerator was planned to reach a maximum capacity of 350,000 tons/year of domestic waste. In order to build this incinerator several phases had to be passed: the environmental impact assessment, the provincial waste plan, the region plan, and changing the local land use plans. These procedures developed partly in parallel in a coordinated way.

AB - The initiative to realise a waste incinerator facility was taken in 1986 by the waste treatment company ‘Vuilafvoer Maatschappij NV’ (VAM) in the village of Wijster. This village is incorporated in the municipality of Beilen, which is located in the province of Drenthe. The VAM company has a long tradition of composting the Dutch biodegradable waste fraction. The compostable fraction is taken there by train from all over the country. As a result of terminating the traditional process, the waste fraction that had to be deposited (at the same location) increased tremendously, which resulted in an increase in the deposited volume of 6 million cubic meters in about 7 years. At that time the existing landfill had nearly reached its maximum capacity. In order to reduce the fraction of the processed waste that had to be dumped, the VAM company proposed to build a waste incineration facility. The incinerator was planned to reach a maximum capacity of 350,000 tons/year of domestic waste. In order to build this incinerator several phases had to be passed: the environmental impact assessment, the provincial waste plan, the region plan, and changing the local land use plans. These procedures developed partly in parallel in a coordinated way.

KW - IR-4888

KW - METIS-101822

U2 - 10.1007/978-94-015-9107-2_7

DO - 10.1007/978-94-015-9107-2_7

M3 - Chapter

SN - 978-90-481-5021-2

T3 - Environment & management

SP - 175

EP - 195

BT - The waste and the backyard : the creation of waste facilities: success stories in six European countries

A2 - Dente, Bruno

A2 - Fareri, Paolo

A2 - Ligteringen, J.J.

PB - Kluwer Academic Publishers

CY - Dordrecht/Boston/London

ER -

Bressers JTA. Any objections after all? Decision making on the siting of a domestic waste incinerator in Wijster, the Netherlands. In Dente B, Fareri P, Ligteringen JJ, editors, The waste and the backyard : the creation of waste facilities: success stories in six European countries. Dordrecht/Boston/London: Kluwer Academic Publishers. 1998. p. 175-195. (Environment & management; 8). https://doi.org/10.1007/978-94-015-9107-2_7