Application of process modelling for industrialised bottom-up production system in the bim-integrated bc industry: Prototype of parking garage projects in the Netherlands

J.H. Park, S. van Nederveen, R. Beheshti, Adriaan Maria Adriaanse, M. de Jonge

    Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

    Original languageEnglish
    Title of host publicationProceedings of the european conference on product and process modelling 2010, ework and ebusiness in architecture, engineering and construction, Cork, Ireland, 14 - 16 September 2010
    EditorsK. Menzel, R. Scherer
    Place of PublicationLondon, UK
    PublisherTaylor & Francis
    Pages157-166
    ISBN (Print)978-0-415-60507-6
    Publication statusPublished - 14 Sep 2010

    Keywords

    • METIS-268449

    Cite this

    Park, J. H., van Nederveen, S., Beheshti, R., Adriaanse, A. M., & de Jonge, M. (2010). Application of process modelling for industrialised bottom-up production system in the bim-integrated bc industry: Prototype of parking garage projects in the Netherlands. In K. Menzel, & R. Scherer (Eds.), Proceedings of the european conference on product and process modelling 2010, ework and ebusiness in architecture, engineering and construction, Cork, Ireland, 14 - 16 September 2010 (pp. 157-166). London, UK: Taylor & Francis.