Are estimated control charts in control?

Willem Albers, W.C.M. Kallenberg

    Research output: Contribution to journalArticleAcademicpeer-review

    66 Citations (Scopus)
    9 Downloads (Pure)

    Abstract

    Standard control chart practice typically assumes normality and uses estimated parameters using data from an in-control process. However, because of the extreme quantiles involved, large relative errors will result for common performance characteristics such as the out-of-control signal probability or the average run length. Due to the estimation, such performance characteristics are stochastic and hence the relative errors involved can be analyzed in various ways. To assess the effects of these various ways of estimation, we look at some exceedance probabilities. It is demonstrated how corrections can be derived to bring the estimated false alarm rates close to their nominal values. Exact results are given, followed by simple approximations. The latter reveal the way in which the corrections depend on the underlying parameters, thus allowing a sensible approach in practice. Some illustration is provided, as well as a brief analysis of the out-of-control behavior of the corrected charts.
    Original languageEnglish
    Pages (from-to)67-79
    Number of pages13
    JournalStatistics
    Volume38
    Issue number1
    DOIs
    Publication statusPublished - 2004

    Keywords

    • MSC-62F25
    • MSC-62P30
    • Statistical Process Control
    • Tolerance region
    • Exceedance probability
    • Shewhart

    Fingerprint

    Dive into the research topics of 'Are estimated control charts in control?'. Together they form a unique fingerprint.
    • Are estimated control charts in control?

      Albers, W. & Kallenberg, W. C. M., 2001, Enschede: University of Twente. 11 p. (Memorandum / Department of Applied Mathematics; no. 1569)

      Research output: Book/ReportReportOther research output

      Open Access
      File

    Cite this