Skip to main navigation Skip to search Skip to main content

Concurrent scheduling of jobs and AGVs in a flexible job shop system: A parallel hybrid PSO‑GA meta‑heuristic

  • Arash Amirteimoori*
  • , Reza Kia
  • *Corresponding author for this work

Research output: Contribution to journalArticleAcademicpeer-review

Abstract

This research proposes a novel mixed integer linear programming (MILP) model
along with a Parallel Hybrid PSO-GA Algorithm (PPSOGA) to address the simultaneous scheduling of jobs and Automated Guided Vehicles (AGVs) in a flexible job shop system. Wherein, finite multiple AGVs, alternative process routes, and job re-entry are considered. To the best of our knowledge, no study in the literature has highlighted the efficacy of parallel computing in the simultaneous scheduling of jobs and transporters in a flexible job shop system which remarkably reduces run-time. For this purpose, the suggested meta-heuristic is designed to be compatible with parallel computing and is compared against a number of well-known meta-heuristics (i.e., Genetic Algorithm, Particle Swarm Optimization, and Ant Colony Optimization) on a set of 40 benchmark instances generated using a combination of different distributions (i.e., uniform, exponential, and normal distributions). Employing two Tukey tests, the run-time means and the objective value means of all the suggested meta-heuristics are examined and compared against one another, the results of which emphasizes the superiority of the PPSOGA over all the other solution approaches in terms of the objective function’s value and run-time. Finally, it is discovered that even the sequential mode of the PPSOGA (i.e., the PSOGA) produces better objective values compared to other meta-heuristics.
Original languageEnglish
Pages (from-to)727-753
Number of pages27
JournalFlexible services and manufacturing journal
Volume35
Issue number3
Early online date14 Jun 2022
DOIs
Publication statusPublished - Sept 2023
Externally publishedYes

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • n/a OA procedure
  • Makespan
  • Parallel hybrid PSO-GA algorithm
  • Statistical test
  • Mixed integer linear programming
  • Parallel computing
  • Flexible job shop scheduling

Fingerprint

Dive into the research topics of 'Concurrent scheduling of jobs and AGVs in a flexible job shop system: A parallel hybrid PSO‑GA meta‑heuristic'. Together they form a unique fingerprint.

Cite this