Correction: A memetic NSGA‑II for the multi‑objective flexible job shop scheduling problem with real‑time energy tariffs (Flexible Services and Manufacturing Journal, (2023), 10.1007/s10696-023-09517-7)

Sascha Christian Burmeister*, Daniela Guericke, Guido Schryen

*Corresponding author for this work

Research output: Contribution to journalComment/Letter to the editorAcademicpeer-review

42 Downloads (Pure)

Abstract

In this article Fig. 18 was incorrectly given; the figure should have appeared as shown below. Also, for Appendix 4, there are some information for specific instances (mk11, mk13, mk14, mk15) (Figs. 28, 30, 31, 32). (Figure presented.) (Figure presented.) (Figure presented.) (Figure presented.) (Figure presented.) Pareto front of mk01 Pareto front of mk11. The computations of the instance mk11 with the epsilons of 693 and 769 time steps were aborted early due to insufficient memory Pareto front of mk13. The computations of the instance mk13 with the epsilons of 438 and 608 time steps were aborted early due to insufficient memory Pareto front of mk14. The computations of the instance mk14 with the epsilon of 2128 time steps was aborted early due to insufficient memory Pareto front of mk15. The computations of the instance mk15 with the epsilons of 389, 471, and 2036 time steps were aborted early due to insufficient memory The original article has been corrected.

Original languageEnglish
JournalFlexible services and manufacturing journal
DOIs
Publication statusE-pub ahead of print/First online - 29 Jan 2024

Fingerprint

Dive into the research topics of 'Correction: A memetic NSGA‑II for the multi‑objective flexible job shop scheduling problem with real‑time energy tariffs (Flexible Services and Manufacturing Journal, (2023), 10.1007/s10696-023-09517-7)'. Together they form a unique fingerprint.

Cite this