Different bridge maintenance strategies and life cycle costs: Comparison of costs in Croatia, Slovenia and the Netherlands

Sandra Skaric Palic*, Irina Stipanovic, Zaharah Allah Bukhsh, Aljosa Sajna

*Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Abstract

Bridges are highly complex structures exposed to heavy environmental and mechanical loads, which require immense financial investments in all life cycle periods, from planning, design, operation and end of life phase. The longest period in whole life cycle of a bridge is operational phase which includes numerous maintenance and repair activities. Timing of these activities and their extent is a crucial factor that influences bridge future performance. Traditionally, the decision to perform maintenance is based on the infrastructure managers' observations, judgments and choices which are derived from inspection results, available budgets and abrupt failures. Though, maintenance based on these drivers very often leads to undue maintenance with increased cost. For this reason, predictive maintenance is considered to be a most effective maintenance policy that suggests to perform maintenance only where it is promptly needed. However, predictive maintenance poses decision-making challenges for infrastructure managers. Particularly for road infrastructure networks, the maintenance decision-making is a difficult task due to a widespread network of diverse infrastructure objects, availability demands, deterioration rate and budget constraints. Such infrastructure maintenance requirements pose decision-making dilemmas to the infrastructure managers, where maintenance planning is challenged by the number of conflicting issues (e.g. limited budget vs. aging network, the risk of failures vs. traffic intensity over an object). This paper tries to examine the effect of two opposing maintenance strategies for life cycle management of bridges, corrective and preventive maintenance based on historical data about bridges in three countries and 30 years of experience. The maintenance costs for bridge structural elements at different condition levels are analysed, based on the data from three countries, Croatia, Slovenia and the Netherlands, where different approaches to maintenance strategies are being applied. The overall maintenance costs over a longer period of time, up to 30 years are collected and analysed, with the aim to clearly define pros and cons for both approaches.

Original languageEnglish
Title of host publicationIABSE Symposium 2019
Subtitle of host publicationTowards a Resilient Built Environment Risk and Asset Management
PublisherInternational Association for Bridge and Structural Engineering (IABSE)
Pages556-562
Number of pages7
ISBN (Electronic)978-1-5108-8445-8
Publication statusPublished - 1 Jan 2019
Event41st IABSE Symposium 2019: Towards a Resilient Built Environment - Risk and Asset Management - Guimaraes, Portugal
Duration: 27 Mar 201929 Mar 2019

Conference

Conference41st IABSE Symposium 2019
Country/TerritoryPortugal
CityGuimaraes
Period27/03/1929/03/19

Keywords

  • Bridges
  • Condition
  • Infrastructure management
  • Maintenance strategies

Fingerprint

Dive into the research topics of 'Different bridge maintenance strategies and life cycle costs: Comparison of costs in Croatia, Slovenia and the Netherlands'. Together they form a unique fingerprint.

Cite this