Abstract
This article focuses upon the training of engineers at a factory producing integrated circuits. Inadequate use of statistical process techniques by the engineers meant that the production process was not being optimised in the context of increasing customer requirements. A training needs analysis was undertaken and a training programme was developed, implemented and evaluated. The results of this programme are presented and conclusions drawn.
Original language | Undefined |
---|---|
Pages (from-to) | 49-61 |
Journal | International journal of training and development |
Volume | 1 |
Issue number | 1 |
DOIs | |
Publication status | Published - 1997 |
Keywords
- METIS-135112
- IR-58323