Abstract
We analyze the integrated tactical capacity planning of spare parts supply and workforce allocation in maintenance logistics of advanced equipment. The equipment time-to-failure, spare parts replenishment time, and equipment repair time are random and independent of each other.
Original language | English |
---|---|
Pages | - |
Publication status | Published - 6 May 2016 |
Event | 27th Annual POMS Conference 2016 - Orlando, United States Duration: 6 May 2016 → 9 May 2016 Conference number: 27 |
Conference
Conference | 27th Annual POMS Conference 2016 |
---|---|
Abbreviated title | POMS |
Country/Territory | United States |
City | Orlando |
Period | 6/05/16 → 9/05/16 |
Keywords
- METIS-316263
- IR-100108