Abstract
This paper focuses on the planning of electricity resources in the developing electricity infrastructure. First we model the existing infrastructure and extend this model to a smart grid infrastructure, where we focus on the large scale introduction of small electricity generators, leading to generation possibilities at both ends of the electricity network. Then the traditional Unit Commitment Problem (UCP) is given. We extend this formulation to the Multilevel Unit Commitment Problem (MUCP), where we describe and include the possibilities that arise in the developing smart grid, in a general way. Based on the characteristics of the problem with its subdivision into different levels, a planning method for the MUCP is described. Finally we solve and analyze a scenario, where a fleet of 5000 houses is added to a small collection of power plants.
Original language | Undefined |
---|---|
Title of host publication | Proceedings of the 1st International Conference on Operations Research and Enterprise Systems |
Place of Publication | Setubal, Portugal |
Publisher | SCITEPRESS |
Pages | 361-370 |
Number of pages | 10 |
ISBN (Print) | 978-989-8425-97-3 |
DOIs | |
Publication status | Published - 2012 |
Event | 1st International Conference on Operations Research and Enterprise Systems 2012 - Vilamoura, Portugal, Vilamoura, Portugal Duration: 6 Feb 2012 → 8 Feb 2012 Conference number: 1 http://www.icores.org/ICORES2012/ |
Publication series
Name | |
---|---|
Publisher | SciTePress |
Conference
Conference | 1st International Conference on Operations Research and Enterprise Systems 2012 |
---|---|
Abbreviated title | ICORES 2012 |
Country/Territory | Portugal |
City | Vilamoura |
Period | 6/02/12 → 8/02/12 |
Internet address |
Keywords
- METIS-286362
- Column generation
- Smart Grids
- Unit commitment
- EWI-21869
- IR-80473