Multiple batch structures in throughput scheduling

P.J. Weeda, P.J. Weeda

    Research output: Contribution to journalArticleAcademicpeer-review

    2 Citations (Scopus)
    60 Downloads (Pure)

    Abstract

    Throughput scheduling deals with maximizing time-constrained throughput in batch production. Previous investigations have shown that time-constrained throughput increases by processing successive batch cycles in simple process configurations consisting of three processes and two facilities, even if set-up times are positive. This paper explores the extension of these results to more complex process configurations.
    Original languageUndefined
    Pages (from-to)359-366
    Number of pages8
    JournalInternational journal of production economics
    Volume0
    Issue number26
    DOIs
    Publication statusPublished - 1992

    Keywords

    • METIS-144541
    • IR-32287

    Cite this