On a Machine Scheduling Problem

S.M. Baas, E.T. Baskoro

    Research output: Other contributionOther research output

    Original languageUndefined
    Place of PublicationInstitut Teknologi, Bandung
    Publication statusPublished - 22 Jan 1996

    Keywords

    • METIS-144133

    Cite this

    Baas, S. M., & Baskoro, E. T. (1996, Jan 22). On a Machine Scheduling Problem. Institut Teknologi, Bandung.
    Baas, S.M. ; Baskoro, E.T. / On a Machine Scheduling Problem. 1996. Institut Teknologi, Bandung.
    @misc{b434031f29bb4c4581e34e7a469824c5,
    title = "On a Machine Scheduling Problem",
    keywords = "METIS-144133",
    author = "S.M. Baas and E.T. Baskoro",
    year = "1996",
    month = "1",
    day = "22",
    language = "Undefined",
    type = "Other",

    }

    Baas, SM & Baskoro, ET 1996, On a Machine Scheduling Problem. Institut Teknologi, Bandung.

    On a Machine Scheduling Problem. / Baas, S.M.; Baskoro, E.T.

    Institut Teknologi, Bandung. 1996, .

    Research output: Other contributionOther research output

    TY - GEN

    T1 - On a Machine Scheduling Problem

    AU - Baas, S.M.

    AU - Baskoro, E.T.

    PY - 1996/1/22

    Y1 - 1996/1/22

    KW - METIS-144133

    M3 - Other contribution

    CY - Institut Teknologi, Bandung

    ER -

    Baas SM, Baskoro ET. On a Machine Scheduling Problem. 1996.