Performance control and redesigning the design and construction process

H.A.J. Neerhof

    Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

    Original languageUndefined
    Title of host publicationApplications of the Performance Concept in Building, Vol. 2, CIB-ASTM-ISO-RILEM, 3rd International Symposium, 9-12 December. Becker, Rachel & Monica Paciuk (eds.)
    Place of PublicationTel-Aviv, Israel
    Pages5-13-5-22
    Number of pages10
    Publication statusPublished - 24 Jan 1996

    Keywords

    • METIS-125753

    Cite this

    Neerhof, H. A. J. (1996). Performance control and redesigning the design and construction process. In Applications of the Performance Concept in Building, Vol. 2, CIB-ASTM-ISO-RILEM, 3rd International Symposium, 9-12 December. Becker, Rachel & Monica Paciuk (eds.) (pp. 5-13-5-22). Tel-Aviv, Israel.
    Neerhof, H.A.J. / Performance control and redesigning the design and construction process. Applications of the Performance Concept in Building, Vol. 2, CIB-ASTM-ISO-RILEM, 3rd International Symposium, 9-12 December. Becker, Rachel & Monica Paciuk (eds.). Tel-Aviv, Israel, 1996. pp. 5-13-5-22
    @inproceedings{75217e79529d43d6a855ac72f356815b,
    title = "Performance control and redesigning the design and construction process",
    keywords = "METIS-125753",
    author = "H.A.J. Neerhof",
    year = "1996",
    month = "1",
    day = "24",
    language = "Undefined",
    isbn = "965-222-753-6",
    pages = "5--13--5--22",
    booktitle = "Applications of the Performance Concept in Building, Vol. 2, CIB-ASTM-ISO-RILEM, 3rd International Symposium, 9-12 December. Becker, Rachel & Monica Paciuk (eds.)",

    }

    Neerhof, HAJ 1996, Performance control and redesigning the design and construction process. in Applications of the Performance Concept in Building, Vol. 2, CIB-ASTM-ISO-RILEM, 3rd International Symposium, 9-12 December. Becker, Rachel & Monica Paciuk (eds.). Tel-Aviv, Israel, pp. 5-13-5-22.

    Performance control and redesigning the design and construction process. / Neerhof, H.A.J.

    Applications of the Performance Concept in Building, Vol. 2, CIB-ASTM-ISO-RILEM, 3rd International Symposium, 9-12 December. Becker, Rachel & Monica Paciuk (eds.). Tel-Aviv, Israel, 1996. p. 5-13-5-22.

    Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

    TY - GEN

    T1 - Performance control and redesigning the design and construction process

    AU - Neerhof, H.A.J.

    PY - 1996/1/24

    Y1 - 1996/1/24

    KW - METIS-125753

    M3 - Conference contribution

    SN - 965-222-753-6

    SP - 5-13-5-22

    BT - Applications of the Performance Concept in Building, Vol. 2, CIB-ASTM-ISO-RILEM, 3rd International Symposium, 9-12 December. Becker, Rachel & Monica Paciuk (eds.)

    CY - Tel-Aviv, Israel

    ER -

    Neerhof HAJ. Performance control and redesigning the design and construction process. In Applications of the Performance Concept in Building, Vol. 2, CIB-ASTM-ISO-RILEM, 3rd International Symposium, 9-12 December. Becker, Rachel & Monica Paciuk (eds.). Tel-Aviv, Israel. 1996. p. 5-13-5-22