@inproceedings{9ffb5cbafdae4c6aa9ef3075db74d020,
title = "Post simulation visualization for effective scheduling of modular building construction",
keywords = "METIS-284570",
author = "M. Moghadam and E. Alyari-Tabrizi and M. Al-Hussein and Al-Jibouri, {Saad H.S.} and A. Telyas",
year = "2011",
month = jun,
day = "14",
language = "English",
isbn = "978-1-894662-18-5",
pages = "CN--194--1--CN--194--10",
editor = "A. Jrade",
booktitle = "Proceedings of the 3rd international / 9th construction specialty conference, June 14-17, 2011, Ottawa, Ontario",
publisher = "Canadian Society for Civil Engineering (CSCE)",
note = "3rd internationa l/ 9th construction specialty conference : Proceedings of the 3rd international / 9th construction specialty conference, June 14-17, 2011, Ottawa, Ontario ; Conference date: 14-06-2011 Through 17-06-2011",
}