Post simulation visualization model for effective scheduling of modular building construction, special issue on construction engineering and management

M. Moghadam, M. Al-Hussein, Saad H.S. Al-Jibouri, A. Telyas

Research output: Contribution to journalArticleAcademicpeer-review

10 Citations (Scopus)
Original languageEnglish
Pages (from-to)1053-1061
JournalCanadian journal of civil engineering
Volume39
Issue number9
DOIs
Publication statusPublished - 2012

Keywords

  • METIS-291400
  • IR-84844

Cite this

@article{31b3da7523624930b23b664fdeb91cb2,
title = "Post simulation visualization model for effective scheduling of modular building construction, special issue on construction engineering and management",
keywords = "METIS-291400, IR-84844",
author = "M. Moghadam and M. Al-Hussein and Al-Jibouri, {Saad H.S.} and A. Telyas",
year = "2012",
doi = "10.1139/l2012-077",
language = "English",
volume = "39",
pages = "1053--1061",
journal = "Canadian journal of civil engineering",
issn = "0315-1468",
publisher = "National Research Council of Canada",
number = "9",

}

Post simulation visualization model for effective scheduling of modular building construction, special issue on construction engineering and management. / Moghadam, M.; Al-Hussein, M.; Al-Jibouri, Saad H.S.; Telyas, A.

In: Canadian journal of civil engineering, Vol. 39, No. 9, 2012, p. 1053-1061.

Research output: Contribution to journalArticleAcademicpeer-review

TY - JOUR

T1 - Post simulation visualization model for effective scheduling of modular building construction, special issue on construction engineering and management

AU - Moghadam, M.

AU - Al-Hussein, M.

AU - Al-Jibouri, Saad H.S.

AU - Telyas, A.

PY - 2012

Y1 - 2012

KW - METIS-291400

KW - IR-84844

U2 - 10.1139/l2012-077

DO - 10.1139/l2012-077

M3 - Article

VL - 39

SP - 1053

EP - 1061

JO - Canadian journal of civil engineering

JF - Canadian journal of civil engineering

SN - 0315-1468

IS - 9

ER -