Post simulation visualization model for effective scheduling of modular building construction, special issue on construction engineering and management

M. Moghadam, M. Al-Hussein, Saad H.S. Al-Jibouri, A. Telyas

Research output: Contribution to journalArticleAcademicpeer-review

17 Citations (Scopus)
Original languageEnglish
Pages (from-to)1053-1061
JournalCanadian journal of civil engineering
Volume39
Issue number9
DOIs
Publication statusPublished - 2012

Keywords

  • METIS-291400
  • IR-84844

Cite this