Abstract
This supplemental material proves two claims of the main paper named "Speed-Robust Scheduling". It provides a Mathematica sheet and its output, proving the last claim of Lemma 11; a Python script used to certify that for the relevant values of number of machines and unit-size jobs, there exists a 4/3-robust solution (Lemma 15); a compressed data file containing the input of the script check.py; a file with human-readable data.
Original language | English |
---|---|
Publisher | 4TU.Centre for Research Data |
Media of output | Online |
Size | 13.09 MB |
DOIs | |
Publication status | Published - 26 Dec 2021 |