This paper presents an account of two developments: the effect of EU Natura 2000 biodiversity policy on local planning and implementation processes, and a shift towards a ‘Building’ or ‘Working’ with Nature approach when designing water infrastructure projects. The account is based on a longitudinal case study of the 35‐year chronology of a flood defence project which has been implemented along the River Scheldt in Flanders. The case study data have been analysed using a chronological time series analysis. The paper concludes that ‘Building’ or ‘Working’ with Nature is resorted to both at the EU and local level, because it works to balance previously conflicting interests and is acceptable to most actors who take part in project implementation. By placing ecological goals at the start of the planning process, the authorities elsewhere in the EU could avoid conflicts of interest and speed up project implementation in Natura 2000 estuaries
Original languageEnglish
Pages (from-to)1359-1379
JournalJournal of environmental planning and management
Volume56
Issue number9
DOIs
Publication statusPublished - 2013

Fingerprint

project design
Estuaries
natural disaster
estuary
Planning
Time series analysis
EU
Biodiversity
planning process
Rivers
implementation process
local planning
Water
time series analysis
conflict of interest
biodiversity
chronology
river
infrastructure
water

Keywords

  • IR-82483
  • METIS-290445

Cite this

@article{b10a9a9e5c8940be88d4453c7b145cf3,
title = "The role of Natura 2000 and project design in implementing flood defence projects in the Scheldt estuary",
abstract = "This paper presents an account of two developments: the effect of EU Natura 2000 biodiversity policy on local planning and implementation processes, and a shift towards a ‘Building’ or ‘Working’ with Nature approach when designing water infrastructure projects. The account is based on a longitudinal case study of the 35‐year chronology of a flood defence project which has been implemented along the River Scheldt in Flanders. The case study data have been analysed using a chronological time series analysis. The paper concludes that ‘Building’ or ‘Working’ with Nature is resorted to both at the EU and local level, because it works to balance previously conflicting interests and is acceptable to most actors who take part in project implementation. By placing ecological goals at the start of the planning process, the authorities elsewhere in the EU could avoid conflicts of interest and speed up project implementation in Natura 2000 estuaries",
keywords = "IR-82483, METIS-290445",
author = "Vera Vikolainen and Bressers, {Johannes T.A.} and Lulofs, {Kristiaan R.D.}",
year = "2013",
doi = "10.1080/09640568.2012.724014",
language = "English",
volume = "56",
pages = "1359--1379",
journal = "Journal of environmental planning and management",
issn = "0964-0568",
publisher = "Routledge",
number = "9",

}

The role of Natura 2000 and project design in implementing flood defence projects in the Scheldt estuary. / Vikolainen, Vera; Bressers, Johannes T.A.; Lulofs, Kristiaan R.D.

In: Journal of environmental planning and management, Vol. 56, No. 9, 2013, p. 1359-1379.

Research output: Contribution to journalArticleAcademicpeer-review

TY - JOUR

T1 - The role of Natura 2000 and project design in implementing flood defence projects in the Scheldt estuary

AU - Vikolainen, Vera

AU - Bressers, Johannes T.A.

AU - Lulofs, Kristiaan R.D.

PY - 2013

Y1 - 2013

N2 - This paper presents an account of two developments: the effect of EU Natura 2000 biodiversity policy on local planning and implementation processes, and a shift towards a ‘Building’ or ‘Working’ with Nature approach when designing water infrastructure projects. The account is based on a longitudinal case study of the 35‐year chronology of a flood defence project which has been implemented along the River Scheldt in Flanders. The case study data have been analysed using a chronological time series analysis. The paper concludes that ‘Building’ or ‘Working’ with Nature is resorted to both at the EU and local level, because it works to balance previously conflicting interests and is acceptable to most actors who take part in project implementation. By placing ecological goals at the start of the planning process, the authorities elsewhere in the EU could avoid conflicts of interest and speed up project implementation in Natura 2000 estuaries

AB - This paper presents an account of two developments: the effect of EU Natura 2000 biodiversity policy on local planning and implementation processes, and a shift towards a ‘Building’ or ‘Working’ with Nature approach when designing water infrastructure projects. The account is based on a longitudinal case study of the 35‐year chronology of a flood defence project which has been implemented along the River Scheldt in Flanders. The case study data have been analysed using a chronological time series analysis. The paper concludes that ‘Building’ or ‘Working’ with Nature is resorted to both at the EU and local level, because it works to balance previously conflicting interests and is acceptable to most actors who take part in project implementation. By placing ecological goals at the start of the planning process, the authorities elsewhere in the EU could avoid conflicts of interest and speed up project implementation in Natura 2000 estuaries

KW - IR-82483

KW - METIS-290445

U2 - 10.1080/09640568.2012.724014

DO - 10.1080/09640568.2012.724014

M3 - Article

VL - 56

SP - 1359

EP - 1379

JO - Journal of environmental planning and management

JF - Journal of environmental planning and management

SN - 0964-0568

IS - 9

ER -